Project 1: Writing Engineering Standards for Network Rail Signalling Power Supply System to make them safer (under SIN 119 Project)

We had written 9-10 signalling power supply standards for STE/Network Rail in order to make the Signalling Power Supply system compliant to Electricity at Work Act as well as BS 7671 to ensure electrical safety. This led to roll out of projects all across the network to make compliant to these standards and thus making it a safer railway infrastructure.

Project 1: Traction bonding of Signalling Power Supply Cabinets (SIN119 project)

Project 1: Local Earthing of Signalling Power Supply cabinets (SIN119 project)

Project 2: ETE, Negative Bonding and DC Electrification Design for Willesden Junction Area for LOCIP

We did the DC electrification System design involving ETE, Negative bonding, DC power supply system and their integration with other system in this complex area where Network Rail type 3rd Rail and LUL type 4th 4 rail traction system co-located with both London Overground and LUL train services. AFC designs were made available to contractor well before scheduled possession.

Willesden Low Level
Willesden Junction Low Level

Project 3: Key Output 2(KO2) for Thameslink Project for Jacobs UK

Project 4: Reading Train Care Depot OLE

Project 4: Planning Route Map for Midland Metro Alliance

Falmer Station

Project 8: Petts Wood Station

Project 7: Gidea Park Siding for MTR-Crossrail